Quantification of the Uncertainties in river discharges due to Climate Change

And the consequences for flood protection designs in The Netherlands

Master Thesis (2018)
Author(s)

D.J.P. Wubben (TU Delft - Civil Engineering & Geosciences)

Contributor(s)

M. Kok – Mentor

Willem Kanning – Graduation committee member

S. van Vuuren – Graduation committee member

JJ Beersma – Graduation committee member

R Vos – Graduation committee member

Faculty
Civil Engineering & Geosciences
Copyright
© 2018 Dennis Wubben
More Info
expand_more
Publication Year
2018
Language
English
Copyright
© 2018 Dennis Wubben
Graduation Date
19-07-2018
Awarding Institution
Delft University of Technology
Sponsors
Royal Netherlands Meteorological Institute (KNMI)
Faculty
Civil Engineering & Geosciences
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

Changes in the Earth’s climate system do have consequences for the river discharges. The development of the future climate is uncertain, which causes uncertainty in the future extreme river discharges. For flood protection considerations, it is important to quantify the climate uncertainties and its effects on extreme river discharges. In this study the uncertainty in extreme river discharges due to Climate Change is quantified. The results indicate the uncertainty in discharge return levels given a specific forcing scenario. Subsequently, the discharge return levels of the KNMI climate scenarios are compared with the found results for the forcing scenarios. The study also provides the consequences of the uncertainty in discharge return levels on the design water levels. The results give the uncertainty in the design water level and the additional height in design water level required to take account for this uncertainty.

Files

Thesis_DennisWubben.pdf
(pdf | 12.8 Mb)
- Embargo expired in 12-07-2018
License info not available