An Integrated Timetable Optimization and Automatic Guided Vehicle Dispatching Method in Smart Manufacturing

Conference Paper (2025)
Author(s)

Jiarong Yao (Nanyang Technological University)

Rong Su (Nanyang Technological University)

C. Tan (TU Delft - Traffic Systems Engineering)

Research Group
Traffic Systems Engineering
DOI related publication
https://doi.org/10.1109/ITSC58415.2024.10920047
More Info
expand_more
Publication Year
2025
Language
English
Research Group
Traffic Systems Engineering
Bibliographical Note
Green Open Access added to TU Delft Institutional Repository ‘You share, we take care!’ – Taverne project https://www.openaccess.nl/en/you-share-we-take-care Otherwise as indicated in the copyright section: the publisher is the copyright holder of this work and the author uses the Dutch legislation to make this work public. @en
Pages (from-to)
1190-1195
ISBN (electronic)
979-8-3315-0592-9
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

Automatic guided vehicle (AGV) fleet management always plays a significant role in smart manufacturing, which is widely studied as a representative nondeterministic polynomial-hard combinatorial optimization problem. With more smart factories featuring specialization in production line and human-robot interaction, AGVs are commonly bound with specific tracks, loading and unloading stations, which makes the current routing algorithms fail to play their path searching ability in complicated network topology. Thus, an integrated timetable optimization and AGV dispatching (TOAD) model is proposed aimed at such case, shifting the emphasis of routing to station selection and route selection from the perspective of timetable designing, while still considering the mixed directivity of layout, conflict avoidance, AGV availability and charging requirements. Targeted at makespan minimization, an improved genetic algorithm (GA) is used for solution with a heuristic operator to seek a better solution within shorter time. The proposed method is evaluated using an empirical factory case study with field data as input, with a comparison with the exact algorithm and standard GA. Results show that a smaller makespan and a shorter computation time can be obtained by the proposed TOAD model in large-scale scenarios, demonstrating a promising application prospect.

Files

License info not available
warning

File under embargo until 20-09-2025