Evaluation of a chemical phosphorus removal process at a pulp mill WWTP in Uruguay

Journal Article (2025)
Author(s)

S. Bentancur (UCU Universidad Católica del Uruguay, IHE Delft Institute for Water Education)

I. Dutra (UCU Universidad Católica del Uruguay)

P. Pereyra (UCU Universidad Católica del Uruguay)

C. M. López Vázquez (IHE Delft Institute for Water Education)

H. A. García (IHE Delft Institute for Water Education)

L. Echeverría (UCU Universidad Católica del Uruguay)

E. De Los Santos (UCU Universidad Católica del Uruguay)

D. Brdjanovic (TU Delft - BT/Environmental Biotechnology, IHE Delft Institute for Water Education)

DOI related publication
https://doi.org/10.1016/j.jenvman.2025.126391 Final published version
More Info
expand_more
Publication Year
2025
Language
English
Bibliographical Note
Green Open Access added to TU Delft Institutional Repository as part of the Taverne amendment. More information about this copyright law amendment can be found at https://www.openaccess.nl. Otherwise as indicated in the copyright section: the publisher is the copyright holder of this work and the author uses the Dutch legislation to make this work public.
Journal title
Journal of Environmental Management
Volume number
390
Article number
126391
Downloads counter
93
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

In this study, the potential biological and chemical removal of phosphorus were assessed in an industrial effluent from a full-scale pulp mill wastewater treatment plant (WWTP) that had a relatively higher influent P-concentration compared to other plants from the same sector. For that purpose, the potential biological removal of phosphorus was evaluated in a lab-scale SBR under fully aerobic conditions for merely biomass synthesis. The chemical P-removal (CPR) process was studied following a co-precipitation (through the addition of coagulants to the lab-scale SBR) and a post-precipitation approach (conducting different jar-tests with the effluent from the SBR). Three coagulants (FeCl3, Al2(SO4)3, and Ca(OH)2) were tested at different concentrations. The treatment of the pulp mill effluent by merely biological means was unable to contribute to a considerable P-removal due to the low P growth requirements of the biomass. The co-precipitation CPR approach showed to be highly effective independently of the coagulant used resulting in removal efficiencies of between 79 and 82 % and achieving final soluble P wastewater concentrations in the range of 0.28–0.34 mgP L−1. However, it struggled to comply with the discharge standard permit limit (annual) of 60 kg TP d−1. On the other hand, the post-precipitation approach (with the addition of Al2(SO4)3 at a PO43−/metal salt ratio (mol-to-mol) of 1:10 or when dosing 400 mg Ca(OH)2 L−1) allowed to achieve the lowest observed TP and soluble P concentrations (lower than 0.5 and 0.2 mgP L−1, respectively).

Files

1-s2.0-S0301479725023679-main.... (pdf)
(pdf | 3.44 Mb)
- Embargo expired in 30-12-2025
License info not available