The Techno-Economic Feasibility of Green Hydrogen Storage in Salt Caverns in the Dutch North Sea

Master Thesis (2022)
Author(s)

D.S. Eradus (TU Delft - Electrical Engineering, Mathematics and Computer Science)

Contributor(s)

Ad J.M. van Wijk – Mentor (TU Delft - Energy Technology)

H Hajibeygi – Graduation committee member (TU Delft - Reservoir Engineering)

Z. Lukszo – Graduation committee member (TU Delft - Energy and Industry)

Faculty
Electrical Engineering, Mathematics and Computer Science
Copyright
© 2022 Deirdre Eradus
More Info
expand_more
Publication Year
2022
Language
English
Copyright
© 2022 Deirdre Eradus
Graduation Date
26-01-2022
Awarding Institution
Delft University of Technology
Programme
Electrical Engineering | Sustainable Energy Technology
Faculty
Electrical Engineering, Mathematics and Computer Science
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

This thesis aims to analyze the techno-economic feasibility of integrating a salt cavern storage system into a green hydrogen production system in the Dutch North Sea, with the objective to provide a constant green hydrogen supply to the industry sector. To this end, the potential for creating salt caverns in the North Sea was examined and the prospected theoretical storage capacity was evaluated and compared to the required storage capacity and the costs of the system were assessed.

The simulations reveal that a 19.8 GW wind park in combination with an 8.65 TWh salt cavern storage system would be sufficient to provide a constant hydrogen supply to a 10 GW pipeline. Four locations in the Dutch North Sea were identified where a group of adjacent salt caverns could be created with a collective storage capacity of at least the required 8.65 TWh. Although further research is required, from this analysis it is concluded that creating a salt cavern storage system of sufficient magnitude may indeed be technically feasible.

The incremental cost of adding to offshore hydrogen production an 8.65 TWh salt cavern storage system is estimated at €5.4 billion, which translates to an addition of 0.17 €/kg to the LCOH for offshore green hydrogen production. Optimization of system design and the financial state of affairs may reduce costs for the storage system and thereby the total LCOH for offshore hydrogen production and storage.