Optimization of the shear tool deployment system for removal of steel piled jackets
Journal Article
(2016)
Author(s)
M Godjevac (TU Delft - Ship Design, Production and Operations)
RHM Huijsmans (TU Delft - Ship Hydromechanics and Structures)
HM van der Eijk (External organisation)
L de Grave (External organisation)
Research Group
Ship Design, Production and Operations
DOI related publication
https://doi.org/10.1177/1475090215571378
To reference this document use:
https://resolver.tudelft.nl/uuid:97ef1936-f604-4cbc-8d94-3ca461fa750c
More Info
expand_more
expand_more
Publication Year
2016
Language
English
Research Group
Ship Design, Production and Operations
Issue number
2
Volume number
230
Pages (from-to)
354-363
No files available
Metadata only record. There are no files for this record.