Integration of Fleet Production and Cost Analysis in Mine Design and Planning

Master Thesis (2019)
Author(s)

Z.M. Diddens (TU Delft - Civil Engineering & Geosciences)

Contributor(s)

M. W.N. Buxton – Mentor

DJM Ngan-Tillard – Graduation committee member

Masoud Shishvan – Graduation committee member

M. Keersemaker – Graduation committee member

Faculty
Civil Engineering & Geosciences
Copyright
© 2019 Zef Diddens
More Info
expand_more
Publication Year
2019
Language
English
Copyright
© 2019 Zef Diddens
Graduation Date
10-01-2019
Awarding Institution
Delft University of Technology
Programme
['Geo-Engineering']
Faculty
Civil Engineering & Geosciences
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

An investigation in the possibility to integrate fleet selection (through FPC) in the mine design process, allowing for the analysis of various potential haul road scenarios and from there being able to make a decision on an optimal fleet selection.

Files

ThesisZ.Diddens.pdf
(pdf | 3.05 Mb)
License info not available