New wind-wave flumes at Delft
More Info
expand_more
expand_more
Abstract
On March 24, 1969, the new wind-wave flumes at the Delft Hydraulics Laboratory (Figures 5 and 6) were officially opened by the Director-General of the Rijkswaterstaat. The design work started in 1964, and the building and installations 1tlere completed in November 1968. A general description of this equipment and some insight into its underlying principles are given below.
Files
DeJong1969.pdf
(pdf | 0.764 Mb)