更高速下轮轨瞬态“滚-滑-跳”接触行为及中/短波不平顺临界限值研究

Journal Article (2024)
Author(s)

Xin Zhao (Southwest Jiaotong University)

Shuangchao Huang (Southwest Jiaotong University)

Jizhong Yang (China Railway Eryuan Engineering Group Co.)

Zhen Yang (TU Delft - Civil Engineering & Geosciences)

Zefeng Wen (Southwest Jiaotong University)

Research Group
Railway Engineering
DOI related publication
https://doi.org/10.3969/j.issn.1001-8360.2024.10.003 Final published version
More Info
expand_more
Publication Year
2024
Language
Chinese
Research Group
Railway Engineering
Bibliographical Note
Green Open Access added to TU Delft Institutional Repository ‘You share, we take care!’ – Taverne project https://www.openaccess.nl/en/you-share-we-take-care Otherwise as indicated in the copyright section: the publisher is the copyright holder of this work and the author uses the Dutch legislation to make this work public.
Journal title
Tiedao Xuebao/Journal of the China Railway Society
Issue number
10
Volume number
46
Pages (from-to)
21-32
Downloads counter
156
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

A review of prediction methods for wheel-rail rolling contact was first prcsented. It is found that thc 3-D transient rolling contact model dcveloped using the explicit finite elemcnt method seems to be the most suitable approach for analyses of transient wheel-rail rolling-sliding-jumping contact at 400 km/h, or at higher speeds, and in the presence of short/medium-wave irregularities. Therefore, a transient rolling contact model was developed to simulate the dynamic curving of a wheelset on a typical curved track in the time domain. Harmonie or ideal rail corrugation was taken as the typical short/medium-wave irregularity to study its influences on transient rolling-sliding-jumping contact, with a wave-length ränge of 30-210 mm considered on the basis of field observations of high-speed wheels and rails in Operation. Be-sides corrugation geometry, corrugation oecurring on the high and/or the low rails was also taken into aecount properly, with the speed up to 500 km/h. Considering dynamic unloading caused by dynamics of low and medium frequency, the critical sizes of short/medium-wave irregularities were determined, at which the wheel-rail contact loss just oecurred. Fi-nally, proposals for management of wheel-rail short/medium-wave irregularities were discussed from the aspects of impor-tance, rationality and application limitations, and compared with the corrugation limit recommended for rail grinding Operations in Management Measures of High-speed Railway Rail Grinding.

Files

On_transient_wheel-rail_rollin... (pdf)
(pdf | 2.87 Mb)
- Embargo expired in 01-05-2025
License info not available