Recent insights on uncertainties present in integrated catchment water quality modelling
Franz Tscheikner-Gratl (TU Delft - Sanitary Engineering, TU Delft - Integral Design & Management)
Vasilis Bellos (National Technical University of Athens)
Alma Schellart (University of Sheffield)
Antonio Moreno-Rodenas (TU Delft - Sanitary Engineering)
Manoranjan Muthusamy (Cranfield University)
Jeroen Langeveld (TU Delft - Sanitary Engineering)
Francois Clemens (Deltares, TU Delft - Sanitary Engineering)
James Shucksmith (University of Sheffield)
Gerard B.M. Heuvelink (Wageningen University & Research)
undefined More Authors (External organisation)
More Info
expand_more
Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.
Abstract
This paper aims to stimulate discussion based on the experiences derived from the QUICS project (Quantifying Uncertainty in Integrated Catchment Studies). First it briefly discusses the current state of knowledge on uncertainties in sub-models of integrated catchment models and the existing frameworks for analysing uncertainty. Furthermore, it compares the relative approaches of both building and calibrating fully integrated models or linking separate sub-models. It also discusses the implications of model linkage on overall uncertainty and how to define an acceptable level of model complexity. This discussion includes, whether we should shift our attention from uncertainties due to linkage, when using linked models, to uncertainties in model structure by necessary simplification or by using more parameters. This discussion attempts to address the question as to whether there is an increase in uncertainty by linking these models or if a compensation effect could take place and that overall uncertainty in key water quality parameters actually decreases. Finally, challenges in the application of uncertainty analysis in integrated catchment water quality modelling, as encountered in this project, are discussed and recommendations for future research areas are highlighted.