Print Email Facebook Twitter Towards a New Model for Collaboration: Evaluation of the effectiveness and efficiency of the “Aronsohn contracting vision” Title Towards a New Model for Collaboration: Evaluation of the effectiveness and efficiency of the “Aronsohn contracting vision” Author Van Rijn, R.M.C. Contributor De Ridder, H.A.J. (mentor) Soons, F.A.M. (mentor) Leijten, M. (mentor) Van den Boom, P.J.F. (mentor) Faculty Civil Engineering and Geosciences Department Bouw Programme Construction Management and Engineering Date 2010-11-15 Abstract The research in this thesis is about the Aronsohn contracting vision, an innovative contract form developed by Aronsohn management. After successfully applying the method on a number of projects they were interested in a more formal evaluation of the method. This evaluation is presented in this report. The idea of Aronsohn is compared to the traditional contract, the bouwteam contract, the D&C contract and later also the Design Novate Construct (DNC) contract. To reference this document use: http://resolver.tudelft.nl/uuid:497030a3-f247-4604-bcd9-f2eb20ffc693 Part of collection Student theses Document type master thesis Rights (c) 2010 Van Rijn, R.M.C. Files PDF Final_version_v1.0.pdf 1.51 MB Close viewer /islandora/object/uuid:497030a3-f247-4604-bcd9-f2eb20ffc693/datastream/OBJ/view