Print Email Facebook Twitter DP challenges in Ana platform jacket installation Title DP challenges in Ana platform jacket installation Author Ardavanis, Kimon (GSP Offshore LLC) Nabergoj, Radoslav (Nasdis PDS d.o.o.) Mauro, F. (TU Delft Ship Design, Production and Operations; University of Strathclyde) Date 2022 Abstract Installation of jacket platforms requires simultaneous and combined operations of multiple assets. When the whole process has to be planned, it is necessary to predict in a fast and reliable way the possible weather limitations that may occur during the operations. The paper will present the major challenges of this unusual and innovative Dynamic Positioning analysis which has been carried out for Ana Jacket installation. The obtained results show that the Dynamic Positioning system of the core vessel in intact configuration is capable to hold the position for the investigated vessels' arrangements and design operative weather conditions. Lifting, upending and installation of Ana Jacket were carried out successfully in 2021. Subject Dynamic PositioningMultibody dynamicsOffshore installation To reference this document use: http://resolver.tudelft.nl/uuid:df9f2750-81af-4aa9-8c9f-91ec17f9ad5d DOI https://doi.org/10.21278/brod73401 ISSN 0007-215X Source Brodogradnja, 73 (4), 1-11 Part of collection Institutional Repository Document type journal article Rights © 2022 Kimon Ardavanis, Radoslav Nabergoj, F. Mauro Files PDF V73No4P1_C1562_PP_Ardavanis.pdf 1.01 MB Close viewer /islandora/object/uuid:df9f2750-81af-4aa9-8c9f-91ec17f9ad5d/datastream/OBJ/view