Print Email Facebook Twitter The 2-phased price determination process in Bouwteam projects in the Netherlands Title The 2-phased price determination process in Bouwteam projects in the Netherlands: An approach towards understanding the price in a construction project: Practical recommendations for the price determination process in Bouwteam Author van der Pas, Eef (TU Delft Civil Engineering and Geosciences) Contributor Straub, A. (mentor) Chan, P.W.C. (graduation committee) Bosch-Rekveldt, M.G.C. (graduation committee) Degree granting institution Delft University of Technology Programme Civil Engineering | Construction Management and Engineering Date 2021-01-19 Abstract Bouwteam is a Dutch project delivery method that involves the contractor and the client in a collaborative way in a construction project's design process. With this early involvement of the contractor, this project delivery method contains two agreements during the project. The first agreement is for the contractor's involvement in the design and the second one is for the project execution. Therefore, price determination becomes a two-phased process. With this two-phased process, both the client and contractor are involved in determining the price for the execution agreement. However, it is currently not clear how they could develop this price cooperatively. This research aims to find success factors for the price determination process in a Bouwteam, by which success factors are strategic management attributes. Due to a lack of literature about the obstacles in the price determination process, the research starts with a focus group discussion. Here, experts identified five obstacles to the price determination process. Accordingly, mitigation strategies for the obstacles were researched with a literature study. Those strategies were hypothesised as success factors in a conceptual model. The hypotheses were studied with four cases studies, including document research and interviewees with both the client and contractor side. Experts evaluated the result of a revised conceptual model of success factors as last. The research concludes with a final model with success factors for the price determination process in Bouwteam projects. This model includes thirteen critical success factors and six indirect success factors that support other critical success factors. Accordingly, the research developed recommendations that contribute to a smooth price negotiation and a price that satisfies both the client and contractors. In further research, the model with success factors can be validated, and more relationships between the success factors and the soft characteristics can be studied. Subject BouwteamPricingEarly Contractor Involvement2-Phased pricing processSuccess factorsConstruction costs To reference this document use: http://resolver.tudelft.nl/uuid:1c536476-8bcb-492d-b6a0-08e1f9512188 Part of collection Student theses Document type master thesis Rights © 2021 Eef van der Pas Files PDF Final_thesis_EefvanderPas.pdf 3.69 MB Close viewer /islandora/object/uuid:1c536476-8bcb-492d-b6a0-08e1f9512188/datastream/OBJ/view