Print Email Facebook Twitter An Integrated Planning Approach Title An Integrated Planning Approach: Maintenance Task Scheduling Optimization Author Peschier, Daan (TU Delft Aerospace Engineering; TU Delft Flight Performance and Propulsion) Contributor Verhagen, Wim (mentor) la Rocca, Gianfranco (graduation committee) Curran, Richard (graduation committee) Lopes Dos Santos, Bruno (graduation committee) Degree granting institution Delft University of Technology Programme Aerospace Engineering Date 2019-02-08 Abstract Aircraft base maintenance consists of hundreds of tasks including preventive, corrective and modification tasks which have to be scheduled to a few check moments per year. The allocation of tasks to checks represents a complex scheduling problem due to the constraints involved. A mixed integer linear programming model was developed to optimize the allocation of the complete base maintenance workload and maintenance checks over a four year period. The model optimizes for resource capacity and interval efficiency. CPLEX has been used as solver. An iterative solution technique loops around the model which yields an approximate optimal solution. The model was developed for a large MRO service provider. Its outcome provides the MRO with an integral insight into the complete workload distribution over a tactical planning horizon for all checks. This insight can help to optimize the allocation of maintenance tasks and resource capacity which will contribute to a higher fleet availability. Subject Aircraft Base MaintenanceMROResource Constrained Project Scheduling ProblemMixed Integer Linear ProgrammingCPLEXTask SchedulingResource Allocationresource efficiencyinterval efficiency To reference this document use: http://resolver.tudelft.nl/uuid:ee1876bd-1748-492f-9608-0b16ae045919 Embargo date 2024-02-08 Part of collection Student theses Document type master thesis Rights © 2019 Daan Peschier Files file embargo until 2024-02-08