Searched for: +
(1 - 2 of 2)
document
Broos, E.J. (EJ.Broos@portofrotterdam.com) (author)
On one of the last remaining plots in the existing port (without the 2nd Maasvlakte), the Port of Rotterdam designed a terminal for the handling of steel slabs (“brammen”). The terminal required a massive quay wall to accommodate the panamax vessels with their heavy cargo. The quay wall is tendered under a design and construct contract. This...
conference paper 2010
document
Hansen, R. (author), Prins, M. (author), Straub, A. (author)
In most literature integrated contracting and procurement is assumed to result in more innovative solutions as a result of the intended process integration. This paper explores Design Build Finance Maintain Operate (DBFMO) cases in the Netherlands on resulting innovations focusing on maintenance and energy-use. It is assumed that in DBFMO...
conference paper 2011