Searched for: +
(1 - 3 of 3)
document
Lee, M. (author)
In order for Jumbo to stay competitive in the offshore market, it's heavy lift vessels should be able to take on a wide range of lifting purposes. This can range from installation of transition pieces for wind turbines to installing modules of fpso's and platforms. One of the demands from the offshore market requires large lifting heights. It is...
master thesis 2016
document
Vooijs, Irene (author)
Tetrahedron is working on a new design for large offshore cranes that can lift higher. This is necessary due to the increasing size of offshore wind turbines, and the inability of the conventional cranes to scale up without needing a larger ship that is carrying them. To compute the forces working on the trusses of the crane structure,...
master thesis 2020
document
Driessen, Mark (author)
Current service and installation activities to offshore wind turbines (OWTs) are mainly carried out by jack-up vessels. These vessels are less susceptive to disturbances caused by sea waves when they lift their hull from the water level by jacking down multiple legs to the seabed. An alternative is a crane mounted on a floating vessel, which has...
master thesis 2021