Searched for: contributor%3A%22Vrijhoef%2C+R.+%28mentor%29%22
(1 - 20 of 25)

Pages

document
Broekman, Jelmar (author)
The construction industry is responsible for the emitting carbon, nitrogen, and particulate matter, which is harmful to the environment and contributes to global warming. Municipalities in the Netherlands plan to reduce emissions in inner-city developments to zero before 2030, for which a transformation of the already...
master thesis 2024
document
Kemerink, Renk (author)
Construction resource management in the Netherlands is causing environmental concerns due to a high demand for infrastructure maintenance and carbon/nitrogen emissions. Insufficient optimization of resource management between projects results in more traffic and higher energy demand, but measures such as linking projects, program management, and...
master thesis 2023
document
Nieuwhoff, Koert (author)
The reuse of secondary materials will be important in achieving a circular built environment. But now, this is challenging since material streams are not synchronized in terms of space and time. Building material hubs, a location where materials are gathered, examined, and momentarily stored before being packed and sent to the building site...
master thesis 2022
document
Fishta, Kristi (author)
Managing building supply chains is significantly challenging due to its temporary nature, design to order, fragmentation and overall complexity of processes. As the built environment strives to achieve a circular domain, there is an increasing need for solutions that close product and organisational systems together with the material and...
master thesis 2021
document
Agricola, Ivo (author)
Over the past years, construction activities in the Netherlands shifted from spacious greenfield developments to dense inner-city redevelopment projects. Approximately 50 per cent of the total turnover in construction is generated within the country’s large cities. It’s expected that this percentage will grow to 80 per cent in the near future(De...
master thesis 2020
document
Visser, Ben (author)
Blockchain technology is able to guarantee an immutable data record which could avoid disputes and litigations. It could also significantly reduce time and costs through process automation. The technology presents a potential solution for the many legal barriers in BIM, regarding ownership of information. This thesis will continue research based...
master thesis 2018
document
Oosterwijk, Lisa (author)
Currently the on-site logistics of construction projects are very inefficient. The construction industry is very fragmented and there are a lot of different information and material processes, therefore it is difficult for a main contractor to get control of these all. It is assumed that if the main contractor gets control of the logistics, the...
master thesis 2017
document
Eitjes, Wouter (author)
master thesis 2017
document
de Jonge-van Wijngaarden, L.D. (author)
master thesis 2017
document
Korvinus, E.B.C. (author)
master thesis 2017
document
Solís Madrigal, M. (author)
master thesis 2016
document
Piet, M. (author)
master thesis 2016
document
Sargentini, N. (author)
De bouwsector in Nederland wordt geconfronteerd met een aantal obstakels, een daarvan is het lage niveau van productiviteit. Hierbij ligt het probleem dat het productiviteitsniveau niet groeit, ook al is het niveau relatief hoog. De oorzaak van het probleem ligt bij arbeidsproductiviteit, dit niveau is erg laag. Het arbeidsproductiviteitsniveau...
master thesis 2016
document
De Jong, R.A. (author)
master thesis 2016
document
Medina Morales, N. (author)
The construction industry has many problems; one of the main complications is its low productivity. There have been many technological efforts for trying to improve it, but they work for specific problems identified, but not for the whole supply chain. It is suggested that a different management approach could improve the problems the...
master thesis 2015
document
Altintas, A. (author)
Een onderzoek naar de toepasbaarheid van innovatieve bouwlogistieke concepten in binnenstedelijke projecten en de voor- en nadelen van deze concepten vanuit een efficiëntie perspectief.
master thesis 2013
document
Post, J.F. (author)
De implementatie van BIM omvat meer dan alleen het aanschaffen van soft- en hardware. Men zal aandacht moeten geven aan de samenwerking met partners, de verschillende culturen en het afstemmen van verschillende processen. Dit is mogelijk door BIM in samenhang met lean en ketenintegratie te implementeren.
master thesis 2013
document
Van der Vliet, K. (author)
master thesis 2012
document
Mobareky Zadeh, E. (author)
This report is about the process between developer and facility manager in the real estate project cycle. In order to analyze such processes intensively, the lean philosophy has been applied.
master thesis 2012
document
Verster, M.P. (author)
master thesis 2009
Searched for: contributor%3A%22Vrijhoef%2C+R.+%28mentor%29%22
(1 - 20 of 25)

Pages