- document
-
Pugatšov, Artjom (author)This paper solves job sequencing with one common and multiple secondary resources (JSOCMSR) problem by encoding it as a Boolean satisfiability (SAT) problem and applying domain-specific heuristics to improve the SAT solver’s performance. JSOCMSR problem is an NP-hard scheduling problem where each job utilizes two resources: a shared resource and...bachelor thesis 2023
- document
-
Tsvetkov, Denis (author)The multi-mode resource-constrained project scheduling problem (MRCPSP) is an extension of the resource-constrained project scheduling problem (RCPSP), which allows activities to be executed in multiple modes. The state-of-the-art solutions for solving this NP-Hard problem are dedicated algorithms and (meta-)heuristics. However, this paper...bachelor thesis 2023