document
Macabú Araújo Peres, Jadyr (author)
With the increasing water depths of the new offshore wind farms, the challenging soil conditions, the availability of assets, and other factors, jack-up installation vessels may no longer be suitable to complete the installation scope of work for the new wind farms. Therefore, installation methods and techniques using floating vessels must be...
master thesis 2023
document
Bosma, Marten (author)
Heerema Marine Contractors is assigned to execute the installation of 64 monopiles for the He Dreiht Offshore Wind Farm provided by Energie Baden-Württemberg (EnBW). The installation of the monopiles is done by means of a template structure. This template is specifically designed for this project and is installed on the seabed temporarily. The...
master thesis 2023
document
REPPAS, APOSTOLOS (author)
Renewable forms of energy, and especially wind energy, have become an integral part of the energy infrastructure around the globe. However, the constant increase of installed wind capacity has put a strain on the selection of potential onshore locations for wind turbine installation. As a result, the wind industry is focusing on offshore...
master thesis 2022
document
van Engelen, Niels (author)
Due to a high demand for offshore wind energy the industry is expanding to evermore challenging locations such as seismic prone areas. The corresponding seismic shocks and vibrations can be transmitted to jack‐up vessels and their cranes used for the installation of these offshore wind turbines. Since a potential collapse due to seismic activity...
master thesis 2021
document
Taks, Thomas (author)
With increasing diameters of offshore monopile foundations, impact hammers require more energy per blow in order to drive them into the seabed. This does not only increase the fatigue loading on the monopile, but it also increases underwater noise that affects marine life. The increase in installation costs due to additional material on the...
master thesis 2020
document
Janse, Arnout (author)
The offshore wind industry is entering a new level of maturity. Announcements of bigger offshore wind turbines, the interest in new locations for offshore wind farms in harsher environments and the appearance of zero subsidy bids are proof of a rapid development. The next generation turbines are expected to be significantly larger and heavier...
master thesis 2018
document
Maliepaard, Mans (author)
The offshore wind market experiences large growth over the last decade. There is a clear trend to installation in deeper waters and to larger wind turbines, to maximize the energy output. The majority of offshore windmills use a monopile foundation, which due to the current trends are getting larger. Seaway Heavy Lifting (SHL) is a company that...
master thesis 2018
document
Teddy Andreas Simanjuntak, Teddy (author)
During S-lay pipeline installation, tension fluctuations in the suspended pipeline are compensated by the tensioner system on the vessel. The goal of this thesis is to answer the questions: to what extent does the active tension compensation (ATC) influence the pipeline integrity during offshore installation. Secondly, which tensioner model...
master thesis 2017
document
Vigney Kumar, Vigney (author)
Offshore Wind Farm (OWF) installation procedure is a complicated phase requiring excellent management of resources for timely completion of tasks. The wind farm installation period involves crucial stages like streamlining onshore logistics, transportation of components on vessels, installation of foundations, wind turbines, and cable laying,...
master thesis 2017