Searched for: subject%3A%22On%255C-time%255C+performance%22
(1 - 4 of 4)
document
van Schilt, Isabelle M. (author), van Kalker, Jonna (author), Lefter, I. (author), Kwakkel, J.H. (author), Verbraeck, A. (author)
Schedule design in the transportation and logistics sector is a widely studied problem. Transport service providers, such as the train industry and aviation, aim for schedules to be on-time according to the planning (i.e., on-time performance or OTP) in order to increase the service level by ensuring that passengers actually make their...
journal article 2024
document
Zohoori, B. (author), Verbraeck, A. (author), Bagherpour, Morteza (author), Khakdaman, M. (author)
This paper presents a new method for measuring and improving production time and cost performance by applying project management concepts and methods. In the context of production and manufacturing industries, we demonstrate how to improve production performance by considering production as a project with limited time and budget in order to...
journal article 2018
document
Prieckaerts, V.E.M. (author)
master thesis 2017
document
Baldi, S. (author), Le, Q.T. (author), Holub, O. (author), Endel, P. (author)
Condensing boilers achieve higher efficiency than traditional boilers by using waste heat in flue gases to preheat cold return water entering the boiler. Water vapor produced during combustion is condensed into liquid form, thus recovering its latent heat of vaporization, leading to around 10–12% increased efficiency. Many countries have...
journal article 2017
Searched for: subject%3A%22On%255C-time%255C+performance%22
(1 - 4 of 4)