Searched for: subject%3A%22Process%255C+modelling%22
(1 - 2 of 2)
document
Zumstein, Marco (author), Chen, Qian (author), Adey, Bryan T. (author), Hall, Daniel M. (author)
How bridge refurbishment projects are performed requires a trade-off between the speed and cost of the project and the amount of traffic disturbances during the project. A possible way to help reach a better balance between these two extremes is the ASTRA Bridge developed in Switzerland. The ASTRA Bridge is a 236-meter long steel ramp system...
journal article 2022
document
Ng, Ming Shan (author), Hall, Daniel M. (author), Schmailzl, Marc (author), Linner, Thomas (author), Bock, Thomas (author)
As use of digital fabrication increases in architecture, engineering and construction, the industry seeks appropriate management and processes to enable the adoption during the design/planning phase. Many enablers have been identified across various studies; however, a comprehensive synthesis defining the enablers of design for digital...
review 2022