Searched for: subject%3A%22rubble%255C-mound%255C%252Bbreakwater%22
(1 - 2 of 2)
document
Van Heemst, C. (author)
This thesis investigates the stability of a crown wall situated above SWL (Still Water Level) on top of a rubble mound breakwater. Crown walls are concrete super structures implemented commonly to provide a flat surface for pipelines and to make the breakwater accessible for vehicles. The vertical distance between SWL and the bottom of the crown...
master thesis 2014
document
Baart, S. (author), Ebbens, R. (author), Nammuni-Krohn, J. (author), Verhagen, H.J. (author)
Present design tools, as found in the Rock Manual or Coastal Engineering Manual, for the determination of toe rock size for rubble mound breakwaters are based on test data with a large spread: data is relatively dispersed around the centre and descriptive equations have limited applicability ranges. New research has been undertaken to contribute...
conference paper 2010