MM

M. Marence

Authored

2 records found

In the Lower Rhine river two hydro-power plants have been built at weirs. The third, most upstream weir at Driel was considered as well, but at the time (1988) could not be made feasible due to the low head difference at Driel. Developments in low-head hydro-power have given new ...
In the Lower Rhine river two hydro-power plants have been built at weirs. The third, most upstream weir at Driel was considered as well, but at the time (1988) could not be made feasible due to the low head difference at Driel. Developments in low-head hydro-power have given new ...

Contributed

1 records found

Exploring sustainable sand-winning in the White Volta

Estimating transient storage upstream of run-of-river weirs for sand winning purposes via hec-ras 6, 1-d, flume models

This research aims to explore sediment transport behavior and accumulation caused by run-of-river weirs in order to examine there feasibility for sustainable sediment mining purposes in the White Volta River. Weirs are used to raise water levels up-stream to increase water levels ...