Hv

Harald van der Mijle Meijer

Authored

2 records found

Rain-induced leading-edge erosion (LEE) of wind turbine blades (WTBs) is associated with high repair and maintenance costs. The effects of LEE can be triggered in less than 1 to 2 years for some wind turbine sites, whereas it may take several years for others. In addition, the gr ...
Rain-induced leading-edge erosion of wind turbine blades is associated with high repair and maintenance costs. For efficient operation and maintenance, erosion models are required that provide estimates of blade coating lifetime at a real scale. In this study, a statistical rainf ...