JM

Johannio Marulanda

1 records found

Authored

In this study, a prestressed concrete girder bridge without plans and with severe levels of deterioration, located in Cali, Colombia, was load-tested to quantify, experimentally, its live-load behavior. The bridge consists of seven prestressed I-girders covered with a reinforced ...