Masoome Shariat
Please Note
2 records found
1
Opportunities and challenges for GeoBIM in Europe
Developing a building permits use-case to raise awareness and examine technical interoperability challenges
The integration of geoinformation with BIM (GeoBIM) is critical to underpin solutions to many city-related challenges. However, to achieve an effective integration it is necessary to consider not only data and technical options but also current practice and users’ needs. This paper describes work carried out within the EuroSDR-GeoBIM project to address this challenge. After investigating potential uses for GeoBIM and existing challenges, we address a planning permits for buildings use case, to help bridging the gap between theory and practice. The resultshighlights a high-level harmonised workflow envisaging the use of GeoBIM information for automating the planning permits process.
appropriate Heating, Ventilation and Air Conditioning system for a building based on room usage, outside air temperature, solar exposure and traffic pollution or validating whether a proposed built asset meets relevant planning constraints.
Developing a coherent approach to GeoBIM integration requires consensus between multiple stakeholders from both the Geo and the BIM side and at an international level. This multi-country and multi-stakeholder approach is the topic of a 2-year EuroSDR project on GeoBIM integration that started in November 2017. The general aim of the project is to detail both the needs and the issues of GeoBIM integration, studied from use cases as well as from existing experiences in the participating countries and to develop initial solutions accordingly. This paper reports initial results – it identifies strong potential for GeoBIM but also rather fragmented activity, with no national level focus. It also notes that research (both in industry and academia) primarily focuses on standards, interoperability and data integration or exchange. Based on these findings – and with a focus on existing work and topics of interest to NMCAs – the next phase of the work will develop more detailed case studies for Asset Management and Urban Planning. ...
appropriate Heating, Ventilation and Air Conditioning system for a building based on room usage, outside air temperature, solar exposure and traffic pollution or validating whether a proposed built asset meets relevant planning constraints.
Developing a coherent approach to GeoBIM integration requires consensus between multiple stakeholders from both the Geo and the BIM side and at an international level. This multi-country and multi-stakeholder approach is the topic of a 2-year EuroSDR project on GeoBIM integration that started in November 2017. The general aim of the project is to detail both the needs and the issues of GeoBIM integration, studied from use cases as well as from existing experiences in the participating countries and to develop initial solutions accordingly. This paper reports initial results – it identifies strong potential for GeoBIM but also rather fragmented activity, with no national level focus. It also notes that research (both in industry and academia) primarily focuses on standards, interoperability and data integration or exchange. Based on these findings – and with a focus on existing work and topics of interest to NMCAs – the next phase of the work will develop more detailed case studies for Asset Management and Urban Planning.