Switching operations in power systems can produce significant overvoltages under specific circumstances. With the increasing application of underground cables in transmission systems, the statistical distribution of energization overvoltages is expected to change substantially du ...
Zero-missing is a phenomenon in shunt compensated cable systems in which the current through the line breaker does not cross the zero point for several cycles. This paper deals with a thorough investigation on countermeasures of the zero-missing phenomenon in transmission systems ...
The worldwide demand for electricity, which is steadily increasing, leads to a continuous need for developing and extending the electrical transmission networks. However, the installation of new overhead lines (OHL) faces many challenges due to societal and environmental reasons. ...
The worldwide demand for electricity, which is steadily increasing, leads to a continuous need for developing and extending the electrical transmission networks. However, the installation of new overhead lines (OHL) faces many challenges due to societal and environmental reasons. ...
The worldwide demand for electricity, which is steadily increasing, leads to a continuous need for developing and extending the electrical transmission networks. However, the installation of new overhead lines (OHL) faces many challenges due to societal and environmental reasons. ...
Application of long EHV XLPE underground cables has divers effects on the transient behavior of transmission grids, mainly due to their large capacitive shunt impedance. Low-order resonance frequencies are one of the features of long cables that deserve special attention. This pa ...
Integration of long EHV XLPE underground cables in traditionally OHL-based transmission systems can result in abnormal transients caused by large cable shunt capacitance. Transients associated with switching of long cables may result in severe temporary or transient overvoltages. ...
This paper deals with the shunt compensation design of long 380kV-50Hz XLPE cables by simulating a double-circuit partially cabled connection with the transmission length of 80km in the Dutch transmission system. The proposed procedure for shunt compensation sizing is fully elabo ...