MM
M.M. Minderhoud
info
Please Note
<p>This page displays the records of the person named above and is not linked to a unique person identifier. This record may need to be merged to a profile.</p>
1 records found
1
Report
(1996)
-
M.M., H., P.H.L.
This report is an attempt to describe existing capacity estimation methods with their characteristic data demands and assumptions. After studying the methods, one should have a better idea about the capacity estimation problem which can be encountered in traffic engineering. Moreover, decisions to employ a particular method should be made (much) easier since advantages, disadvantages and other aspects concerning the application of the methods are discussed.
...
This report is an attempt to describe existing capacity estimation methods with their characteristic data demands and assumptions. After studying the methods, one should have a better idea about the capacity estimation problem which can be encountered in traffic engineering. Moreover, decisions to employ a particular method should be made (much) easier since advantages, disadvantages and other aspects concerning the application of the methods are discussed.