GV

G.A. Van Nederveen

info

Please Note

1 records found

The level of failure costs in Building and Construction is still at a high level. A major cause of failure costs is the use non valid or wrong documents / models in the process. The release process is about controlling the quality of documents / models in a structured way. The ma ...