RB
Rene Bos
info
Please Note
<p>This page displays the records of the person named above and is not linked to a unique person identifier. This record may need to be merged to a profile.</p>
1 records found
1
A lack of knowledge on the economic feasibility and optimal design and operation of offshore hybrid wind-hydrogen parks is identified by utility companies and grid operators. This study reviews the techno-economic optimisation of an offshore wind-hydrogen park from a developer’s perspective and specifically considers the electrolyser technology and wind-hydrogen ratio. A MATLAB model has been developed that optimises between electricity and hydrogen production based on the wholesale energy prices and conversion losses. Electricity uptake and curtailment are included too.
...
A lack of knowledge on the economic feasibility and optimal design and operation of offshore hybrid wind-hydrogen parks is identified by utility companies and grid operators. This study reviews the techno-economic optimisation of an offshore wind-hydrogen park from a developer’s perspective and specifically considers the electrolyser technology and wind-hydrogen ratio. A MATLAB model has been developed that optimises between electricity and hydrogen production based on the wholesale energy prices and conversion losses. Electricity uptake and curtailment are included too.