Offshore infrastructure planning using a vine copula approach for environmental conditions

an application for replacement maintenance of tidal energy infrastructure

Journal Article (2019)
Author(s)

Ruben de Nie (Damen Shipyards, Student TU Delft)

George Leontaris (TU Delft - Integral Design & Management)

Don Hoogendoorn (Damen Shipyards)

A. R M (Rogier) Rogier Wolfert (TU Delft - Integral Design & Management)

Research Group
Integral Design & Management
Copyright
© 2019 Ruben de Nie, G. Leontaris, Don Hoogendoorn, A.R.M. Wolfert
DOI related publication
https://doi.org/10.1080/15732479.2018.1558268
More Info
expand_more
Publication Year
2019
Language
English
Copyright
© 2019 Ruben de Nie, G. Leontaris, Don Hoogendoorn, A.R.M. Wolfert
Research Group
Integral Design & Management
Issue number
5
Volume number
15
Pages (from-to)
600-617
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

Installation and maintenance operations of offshore assets are impacted by local environmental conditions such as wave height and period, wind speed and current velocity. These parameters are substantially of influence for the asset planning (time and costs) given the uncertainty of operational windows. In this article, a method is proposed to construct realistic time series of the aforementioned dependent conditions using a vine copulas approach. This method makes it possible to obtain a large number of realizations of these conditions at a certain location. It is shown that the operational windows remain persistent with the original limited dataset. Moreover, this method enables the incorporation of environmental uncertainties in the operational planning processes. To illustrate the value of this method, an application regarding replacement maintenance of a tidal energy infrastructure is examined. For this purpose, the maintenance activities are represented as a semi-Markov decision process. For every synthetic environmental time series, the algorithm finds the optimal set of decisions and the corresponding maintenance plans, including replacement costs and revenue losses. It is shown that the proposed method is effective in replacement maintenance decision making, while taking into account the environmental uncertainties.

Files

De_Nie_et_al._2019_Accepted_ma... (pdf)
(pdf | 4.96 Mb)
- Embargo expired in 26-01-2020
License info not available