Investigation of the first quasi-rectangular metro tunnel constructed by the 0−θ method

Journal Article (2024)
Author(s)

Peinan Li (Donghua University)

Xue Liu (Donghua University)

Xi Jiang (University of Tennessee)

Xuehui Zhang (Geo-engineering)

Jun Wu (Shanghai University of Engineering Science)

Peixin Chen (Shanghai Tunnel Engineering Co. Ltd.)

Geo-engineering
DOI related publication
https://doi.org/10.1007/s11709-023-0991-9
More Info
expand_more
Publication Year
2024
Language
English
Geo-engineering
Issue number
11
Volume number
17
Pages (from-to)
1707-1722
Downloads counter
253
Collections
Institutional Repository
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

Quasi-rectangular shield tunneling is a cutting-edge trenchless method for constructing metro tunnels with double tubes, owing to its advantages in saving underground space and reducing ground disturbance. However, the conventional quasi-rectangular shield tunneling method is not applicable when constructing a tunnel without a center pillar, such as a scissor crossover section of a metro line. Therefore, the 0−θ tunneling method, which combines the quasi-rectangular shield and pipe jacking methods, was investigated in this study to solve the aforementioned construction challenges. This study presents a case study of the Sijiqing Station of the Hangzhou Metro Line 9 in China, in which the 0−θ method was first proposed and applied. Key techniques such as switching between two types of tunneling modes and the tunneling process control in complex construction environments were investigated. The results demonstrated that the 0−θ method can address the technical challenges presented by the post-transition line with a high curvature and a scissors crossover line. In addition, the adoption of the 0−θ method ensured that the transformation between shield tunneling and pipe jacking was safe and efficient. The ground settlement monitoring results demonstrated that the disturbance to the surrounding environment can be limited to a safe level. This case study contributes to the construction technology for a metro tunnel containing both post-transition lines with a small turning radius and a scissors crossover line. A practical construction experience and theoretical guidance were provided in this study, which are of significance for both the industry and academia.

Files

S11709_023_0991_9.pdf
(pdf | 4.14 Mb)
- Embargo expired in 11-07-2024