A Co-simulation Framework for the Provision of Support Services by Smart Residential Users in LV Distribution Systems

Conference Paper (2021)
Author(s)

P.P. Vergara Barrios (TU Delft - Intelligent Electrical Power Grids)

Arun Subramanian (TNO Science and Industry)

Aliene Van Der Veen (TNO Science and Industry)

Koen Kok (Eindhoven University of Technology)

Research Group
Intelligent Electrical Power Grids
Copyright
© 2021 P.P. Vergara Barrios, Arun Subramanian, Aliene Van Der Veen, Koen Kok
DOI related publication
https://doi.org/10.1109/PowerTech46648.2021.9495062
More Info
expand_more
Publication Year
2021
Language
English
Copyright
© 2021 P.P. Vergara Barrios, Arun Subramanian, Aliene Van Der Veen, Koen Kok
Research Group
Intelligent Electrical Power Grids
ISBN (electronic)
9781665435970
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

In this paper, a co-simulation framework is presented to assess the impact on the distribution network of provision of support services (i.e. voltage support) by smart residential users. Such users are capable of providing flexibility by increasing/decreasing generation/consumption controlling the operation of an available set of flexible assets. The control of assets such as PV systems, electrical vehicles (EVs), heat storage and micro combined heat and power (mCHP) units is done by a Customer Energy Manager (CEM) after receiving flexibility requests as a result of an Aggregator-Distribution System Operator (DSO) interaction. In the presented framework, the distribution system is modeled in OpenDSS while the aggregator-flexible asset interaction, including the market-clearing procedure, is modeled using the Energy System Simulator (ESSIM). Results from several simulated scenarios are presented. According to the presented results, in summer, where over-voltage issues are expected due to the high PV penetration, a solution rate of 90% is estimated. For winter, in which under-voltage issues are more predominant, the solution rate is found to be around 70%.

Files

License info not available