Optimization and Comparison of Superconducting Generator Topologies for a 10 MW Wind Turbine Applications

More Info
expand_more

Abstract

A direct-drive superconducting generator (DDSCG) is proposed for 10 MW wind turbines in the INNWIND.EU project. To fit the generator into the ``king-pin'' conceptual nacelle design, the generator structure with inner stationary superconducting (SC) field winding and outer rotating copper armature winding is investigated in the first research phase. Since the cost is an important performance indicator for this application, this paper presents a method to minimize the active material cost of the ``king-pin'' fitted DDSCG. In this method a relatively fast optimization program is developed with 2D non-linear finite element models. By implementing this method, three typical superconducting generator topologies are compared in terms of the active material cost and mass, the synchronous reactance and the phase resistance. The optimization method and the comparison results provide the DDSCG designers with a guideline for selecting a suitable machine topology.

Files

Jae_53_jae140161.pdf
(pdf | 1.84 Mb)
Unknown license

Download not available