Analysis of Pile-Concrete Connections in Near-Shore Applications

Master Thesis (2015)
Author(s)

S. Belfroid

Contributor(s)

F.S.K. Bijlaard – Mentor

R. Abpsoel – Mentor

C.R. Braam – Mentor

M.A.N. Hendriks – Mentor

F. van der Woerdt – Mentor

Copyright
© 2015 Belfroid, S.
More Info
expand_more
Publication Year
2015
Copyright
© 2015 Belfroid, S.
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

Tubular steel sections are used as foundation piles in near-shore applications like jetties or bridgeworks. The steel tubes are connected to a concrete capping beam or pile cap which transfers the forces from the structure to the piles. Multiple options for this connection type have been developed over the years with varying specifications. Constructability, costs and construction time are of high importance when adopting an alternative. In this report, the alternatives are listed and a trade-off is made. Furthermore, a more detailed investigation is performed regarding the chosen alternative.