Streamlining Pin Piles Logistics
A Concept Study Toward Efficiency and Scalability
N.J. van der Sluijs (TU Delft - Mechanical Engineering)
W. van den Bos – Mentor (TU Delft - Transport Engineering and Logistics)
Panagiotis Antonakas – Mentor (Royal Boskalis Westminster)
Ike van Giffen – Mentor (Royal Boskalis Westminster)
J. Jovanova – Graduation committee member (TU Delft - Transport Engineering and Logistics)
C.S. Wijesinghe – Graduation committee member (TU Delft - Transport Engineering and Logistics)
More Info
expand_more
Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.
Abstract
As offshore wind turbines grow beyond 15 MW, the logistical and mechanical challenges of installing large-diameter pin piles have intensified. Conventional upending methods, such as crawler crane-based operations, face increasing limitations in deck space efficiency, motion sensitivity, and operational persistency, thereby constraining the scalability of current offshore foundation installation practices. This study presents an integrated framework to identify and evaluate next-generation logistical concepts for pin pile handling. Through a structured morphological approach, over 120 storage, transport, and upending configurations were generated and screened through a Multi-Criteria Analysis (MCA). The top-performing concepts were further analyzed using Multi Operation Persistency (MOP) simulations to quantify weather downtime and operational duration. Cost modeling revealed that concepts combining in-grillage storage with tail-end rotation mechanisms significantly reduce project duration and total project costs compared to the baseline. Following from this, two refined mechanical solutions, Deck Rotation and Dutch Bike Rack, were developed, optimized for lifting height, and validated for structural and dynamic feasibility. Both mechanisms enable safe, reversible upending within compact vessel layouts. The results demonstrate that logistical integration and mechanical innovation can unlock new efficiencies in offshore wind foundation installation, offering scalable and cost-effective solutions for future energy infrastructure.
Files
File under embargo until 25-06-2027