Streamlining Pin Piles Logistics

A Concept Study Toward Efficiency and Scalability

As offshore wind turbines grow beyond 15 MW, the logistical and mechanical challenges of installing large-diameter pin piles have intensified. Conventional upending methods, such as crawler crane-based operations, face increasing limitations in deck space efficiency, motion sensi ...

Coupled Dynamics of a Dual Lift Operation

Upending Method of an XXL Monopile

Offshore wind farms are moving to deeper waters, implying that larger substructures will need to be installed. The monopile is the leading substructure nowadays and this structure could be promising for use in deeper waters as well. Generally, jack-up vessels are used for the ins ...
With the conversion of a heavy transport vessel into a crane vessel, Boskalis aims to strengthen its position in the offshore wind and decommissioning markets. The BOKALIFT 1, as the crane vessel will be named, is equipped with a 3,000 tonne crane and a class-2 Dynamic Positionin ...