Blue Growth Development in the Mediterranean Sea

Quantifying the Benefits of an Integrated Wave Energy Converter at Genoa Harbour

Journal Article (2020)
Author(s)

G. Lavidas (TU Delft - Offshore Engineering)

Francesco De Leo (University of Genoa)

Giovanni Besio (University of Genoa)

Research Group
Offshore Engineering
Copyright
© 2020 G. Lavidas, Francesco De Leo, Giovanni Besio
DOI related publication
https://doi.org/10.3390/en13164201
More Info
expand_more
Publication Year
2020
Language
English
Copyright
© 2020 G. Lavidas, Francesco De Leo, Giovanni Besio
Research Group
Offshore Engineering
Issue number
16
Volume number
13
Pages (from-to)
1-14
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

Coastal resilience is often achieved by traditional civil engineering projects, such as dikes and breakwaters. However, given the pressing nature of Climate Change, integrating energy converters in “classical” structures can enhance innovation, and help in pursuing decarbonisation targets. In this work, we present an alternative for integrating a wave energy converter at a vertical wall breakwater, following past successful projects. Our approach is based on a high spatio-temporal wave dataset to properly quantify expected energy production, but also focus on the hours for which other time-dependent renewables cannot produce, i.e., solar. Our analysis evaluates the power performance and assesses the economic parameters and viability of the proposed installation. Our integrated solution shares the main capital with the breakwater and can produce from 390 MWh–2300 MWh/year, displacing more than 1760 Tn of CO2 annually. In addition to power generated, we estimated the payback period for most cases being approximately 10–15 years, but when accounting avoided oil CO2 emissions, the installation is highly attractive with payback in less than 9 years, with favourable financing indicating 3.4 years

Files

License info not available