Scheveningen Harbour Project

More Info
expand_more
Publication Year
2016
Copyright
© 2016 The Authors
Coordinates
52.0975, 4.266944
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

The Hague Municipality, which is responsible for Scheveningen Harbour, is seeking solutions for two problems it is currently facing: reorganization/expansion of Scheveningen Harbour considering the shortage of marina places and the future demands; and connection of the north and south sides of the harbour, namely, bridging De Pijp. CoMEM TU Delft students were retained to provide a solution to these problems, as part of the Multidisciplinary project (CT4061-09) course. This final report covers the full description of the problem and the solutions proposed – a reorganization of Scheveningen Harbour, focused mainly in the Yacht Harbour; the construction of a new marina harbour in De Kom, hereafter called as Scheveningen Fourth Harbour, that includes a new breakwater; and a taxi boat to fulfil the connection demand for the north and south sides of the harbour.

Files

License info not available