Hub exchange operations in intermodal hub-and spoke networks

A performance comparison of rail-rail exchange facilities

Doctoral Thesis (2006)
Contributor(s)

H. Priemus – Promotor

R. Dekker – Promotor

Copyright
© 2006 Y.M. Bontekoning
More Info
expand_more
Publication Year
2006
Copyright
© 2006 Y.M. Bontekoning
Related content
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

The implementation of hub-and-spoke networks in intermodal transport is suggested as one of the potential solutions for helping to increase the intermodal market share. Traditionally, trains are shunted at hubs; this is a time-consuming process. Since the early 1990s a new type of intermodal terminal, specifically designed for fast tran-shipment at nodes in hub-and-spoke networks, has been introduced in Europe. These hub terminals could replace this time-consuming shunting. Studies on the new hub terminals suggest that they may perform more efficiently than shunting yards. However, a systematic comparison to reveal the operational and costs differences be-tween shunting and these new hub-terminals for a broad range of situations still lacks. The main objective of the study was to develop a model to identify favourable opera-tional conditions for new hub terminals to be implemented and to quantify their op-erational performances in relation to alternative hub exchange facilities. Simulation models were developed to study rail-rail exchange operations at new hub-terminals, hump and flat shuntings yard and road-rail terminals.

Files

License info not available