Analysing and improving risk management in an Engineer-to-order environment

Master Thesis (2018)
Author(s)

Z. Guo (TU Delft - Civil Engineering & Geosciences)

Contributor(s)

M. Hertogh – Mentor

E. Hoseini – Mentor

M. Leijten – Mentor

Lester Verhoef – Mentor

Joanne Kuo – Mentor

Faculty
Civil Engineering & Geosciences
Copyright
© 2018 Zhipeng Guo
More Info
expand_more
Publication Year
2018
Language
English
Copyright
© 2018 Zhipeng Guo
Graduation Date
18-09-2018
Awarding Institution
Delft University of Technology
Programme
['Civil Engineering | Construction Management and Engineering']
Faculty
Civil Engineering & Geosciences
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

The research is aimed to apply risk management and the GRMM (Generic Risk Maturity Model) in an ETO (Engineer-to-order) environment by using Huisman Equipment as a case study, to see what are the improvement areas.

Files

License info not available