Time-horizons in the planning and operation of transmission networks

An overview

Journal Article (2016)
Author(s)

Swasti R. Khuntia (TU Delft - Intelligent Electrical Power Grids)

Bart Tuinema (TU Delft - Intelligent Electrical Power Grids)

J.L. Rueda Torres (TU Delft - Intelligent Electrical Power Grids)

Mart A.M.M. van der Meijden (TenneT TSO B.V., TU Delft - Intelligent Electrical Power Grids)

Research Group
Intelligent Electrical Power Grids
Copyright
© 2016 S.R. Khuntia, B.W. Tuinema, José L. Rueda, M.A.M.M. van der Meijden
DOI related publication
https://doi.org/10.1049/iet-gtd.2015.0791
More Info
expand_more
Publication Year
2016
Language
English
Copyright
© 2016 S.R. Khuntia, B.W. Tuinema, José L. Rueda, M.A.M.M. van der Meijden
Research Group
Intelligent Electrical Power Grids
Issue number
4
Volume number
10
Pages (from-to)
841-848
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

In the planning and operation of power systems, actions are taken in different processes and time-horizons. The purpose of these actions is to secure a high reliability level. Although the three main processes (grid development, asset
management, and system operation) are described in literature, there has been no explicit study on the time-horizons (long-term, mid-term, and short-term) and actual time-scale (decades, years, months, etc.) that these processes focus
on. This study aims at making a review of the various activities performed by transmission system operators while reviewing the concept of each time-horizon and methodologies developed in literature. As decisions taken in different
time-horizons can influence each other, the interactions and overlapping are discussed.

Files

1694309.pdf
(pdf | 0.748 Mb)
License info not available