A Robust Solution to Train Shunting using Decision Trees

Master Thesis (2018)
Author(s)

S. Bao (TU Delft - Electrical Engineering, Mathematics and Computer Science)

Contributor(s)

Sicco Verwer – Mentor

MM De Weerdt – Mentor

Faculty
Electrical Engineering, Mathematics and Computer Science
Copyright
© 2018 Shiwei Bao
More Info
expand_more
Publication Year
2018
Language
English
Copyright
© 2018 Shiwei Bao
Graduation Date
29-10-2018
Awarding Institution
Delft University of Technology
Faculty
Electrical Engineering, Mathematics and Computer Science
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

This research tackles the Train Unit Shunting Problem (TUSP) in train maintenance service sites. Many researches focus on producing feasible solutions, but only a few of them concentrate on the robustness of solutions. In reality, it is preferred to generate robust plans against unpredictable disturbances. Besides, the approach is expected to replan if disturbances occur while performing the plan. We propose this Decision Tree (DT)-based sequential approach (DTS) that solves the TUSP by sequentially making a sub-decision according to the DT prediction. It generates solutions that are both feasible and robust. Furthermore, it operates fast using the pre-trained model. We conduct experiments and compare its performance with a heuristic algorithm and the Local Search algorithm (LS). The proposed approach DTS solves fewer problems than LS and the heuristic, but it outperforms others by generating more robust solutions.

Files

License info not available