Polder pumping-station for the future

designing and retrofitting infrastructure systems under structural uncertainty

Journal Article (2020)
Author(s)

J. Timmermans (TU Delft - Policy Analysis)

Emiel van Druten (Witteveen+Bos)

Marcel Wauben (Witteveen+Bos)

J. H. Kwakkel (TU Delft - Policy Analysis)

Research Group
Policy Analysis
Copyright
© 2020 Jos Timmermans, Emiel van Druten, Marcel Wauben, J.H. Kwakkel
DOI related publication
https://doi.org/10.1080/23789689.2020.1762402
More Info
expand_more
Publication Year
2020
Language
English
Copyright
© 2020 Jos Timmermans, Emiel van Druten, Marcel Wauben, J.H. Kwakkel
Research Group
Policy Analysis
Issue number
3
Volume number
7
Pages (from-to)
222-238
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

In designing and retrofitting infrastructure systems, engineers are increasingly confronted by uncertainties about the future operating conditions of these systems, stemming from climate change or rapid socio-economic development. Particularly for long-lived capital-intensive infrastructure components like pumping stations, current engineering practices need to be complemented by structured approaches for designing infrastructures whose performance is robust to a wide range of possible future operating conditions. This paper presents multi-objective robust simulation as a viable approach. We investigate its applicability in a case study of the re-design of a polder pumping-station in The Netherlands. The research demonstrates the added value of multi-objective robust simulation in establishing robust design alternatives. The approach generates additional decision relevant insights into the performance of the pumping-station under uncertain future conditions while supplying decision-makers with the information required to make informed trade-offs amongst key design choices.

Files

Polder_pumping_station_for_the... (pdf)
(pdf | 3.48 Mb)
- Embargo expired in 17-12-2020