A newly installed research infrastructure for geothermal energy in a subsurface sedimentary reservoir for direct-use heating

The TU Delft campus geothermal project

Abstract (2024)
Author(s)

H. Abels (TU Delft - Applied Geology)

A. Barnhoorn (TU Delft - Applied Geophysics and Petrophysics)

A. Daniilidis (TU Delft - Reservoir Engineering)

David Bruhn (TU Delft - Reservoir Engineering)

G. Drijkoningen (TU Delft - Applied Geophysics and Petrophysics)

K.N. Elliott (TU Delft - Lab Geoscience and Engineering)

Beer van Esser (TU Delft - Lab Geoscience and Engineering)

S. Laumann (TU Delft - Applied Geophysics and Petrophysics)

Piet van Paassen (TU Delft - Lab Geoscience and Engineering)

L. Vargas Meleza (TU Delft - Lab Geoscience and Engineering)

A.G. Vondrak (TU Delft - Lab Geoscience and Engineering)

D. Voskov (TU Delft - Reservoir Engineering)

Phil Vardon (TU Delft - Geo-engineering)

Research Group
Applied Geology
DOI related publication
https://doi.org/10.5194/egusphere-egu24-20414
More Info
expand_more
Publication Year
2024
Language
English
Research Group
Applied Geology
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

A geothermal doublet has been installed in a sedimentary reservoir for direct-use heating on the TU Delft campus, targeted to supply around 25 MW of thermal energy at peak conditions. This contribution presents the implementation and initial data collection from the doublet, including an initial evaluation of the logging and coring campaign. Nearly half of Netherlands natural gas consumption is allocated to heating, and the on-campus CO2 emissions from heating exceed 50%. The doublet has been designed with two primary aims of research and commercial heat supply, with the wells being completed in December 2023. The project will be operated by a commercial entity, and built into a larger thermal energy system including a high temperature underground storage system, with the first energy production planned in 2025. The research questions relate to field-scale geothermal operations, e.g. how reliable is the long-term energy production?, how do materials perform in the long-term? and how can geothermal projects be best monitored? The research programme involves the installation of a wide range of instruments alongside an extensive logging and coring program and monitoring network. The doublet has been cored, with substantial continuous samples from the heterogenous reservoir, alongside a large suite of open hole well logs in the reservoir and through casing logs in overlying geological units. A fiber-optic cable will monitor distributed pressure throughout the producer reservoir section, at approximately 2300m depth, which will be installed during commissioning. A local seismic monitoring network has been installed in the surrounding area with the aim of monitoring very low-magnitude natural or induced seismicity. The project is a key national research infrastructure and is being incorporated into the European EPOS (European Plate Observing System, https://www.epos-eu.org/), such that accessibility and data availability will be as wide as possible. All observations will be included in a digital-twin framework that will allow to make better decisions in future geothermal projects.