LV
L. Vargas Meleza
info
Please Note
<p>This page displays the records of the person named above and is not linked to a unique person identifier. This record may need to be merged to a profile.</p>
6 records found
1
Journal article
(2026)
-
David Bruhn, Hemmo A. Abels, Patrick Fulton, Virginie Harcouët-Menou Harcouët-Menou, Ernst Huenges, Stefan Jansen, Alexis Koulidis, Susanne Laumann, Haiyan Lei, Joseph Moore, Paula Rulff, Thorben Schöfisch, Auke Barnhoorn, Evert Slob, Philip J. Vardon, Liliana Vargas Meleza, Denis Voskov, Claire Bossennec, Aoife K. Braiden, Maren Brehme, Romain Chassagne, Alexandros Daniilidis, Mathieu Darnet, Guy Drijkoningen
Low-enthalpy geothermal heat production is becoming increasingly common, which leads to the potentially competitive use of the available subsurface space, especially in densely populated urban areas. A specific challenge presented by the high density of different geothermal systems is understanding the details of convective and conductive heat flow processes and detailed monitoring of properties and processes in the subsurface.
On the TU Delft campus, we aim to drill a borehole of around 4.5 km depth to be used for the exploration, observation, and monitoring of subsurface processes that will be part of a larger research infrastructure under development. This so-called urban energy laboratory includes – in addition to the deep multi-use borehole – a well-instrumented geothermal doublet drilled in 2023, reaching to a depth of 2.2 km; a local seismic monitoring system (installed in 2022); an ultra-sensitive portable seismic monitoring array; and a high-temperature aquifer heat storage system (HT-ATES), for which a pilot well was drilled in 2024. With this urban energy laboratory, we want to tackle problems and better understand processes related to multiple and/or competing subsurface uses in urban environments. The deep exploration and monitoring borehole is designed specifically to monitor fluid and/or flux movement in 3D with unprecedented precision, aiming to understand the propagation of the geothermal cold front and reservoir pressures.
During the 3 d International Continental Scientific Drilling Program (ICDP)-sponsored UrbEnLab workshop, 75 scientists from 17 countries met in Delft, the Netherlands, in June 2024 to prioritize the scientific ambitions of the deep exploration and monitoring borehole and to discuss potential techniques that could be applied to tackle them. Assessing the life cycle of a geothermal system situated in a complex heterogeneous sedimentary system was defined as the broad aim, with revealing the detailed flow field established being a key priority. ...
On the TU Delft campus, we aim to drill a borehole of around 4.5 km depth to be used for the exploration, observation, and monitoring of subsurface processes that will be part of a larger research infrastructure under development. This so-called urban energy laboratory includes – in addition to the deep multi-use borehole – a well-instrumented geothermal doublet drilled in 2023, reaching to a depth of 2.2 km; a local seismic monitoring system (installed in 2022); an ultra-sensitive portable seismic monitoring array; and a high-temperature aquifer heat storage system (HT-ATES), for which a pilot well was drilled in 2024. With this urban energy laboratory, we want to tackle problems and better understand processes related to multiple and/or competing subsurface uses in urban environments. The deep exploration and monitoring borehole is designed specifically to monitor fluid and/or flux movement in 3D with unprecedented precision, aiming to understand the propagation of the geothermal cold front and reservoir pressures.
During the 3 d International Continental Scientific Drilling Program (ICDP)-sponsored UrbEnLab workshop, 75 scientists from 17 countries met in Delft, the Netherlands, in June 2024 to prioritize the scientific ambitions of the deep exploration and monitoring borehole and to discuss potential techniques that could be applied to tackle them. Assessing the life cycle of a geothermal system situated in a complex heterogeneous sedimentary system was defined as the broad aim, with revealing the detailed flow field established being a key priority. ...
Low-enthalpy geothermal heat production is becoming increasingly common, which leads to the potentially competitive use of the available subsurface space, especially in densely populated urban areas. A specific challenge presented by the high density of different geothermal systems is understanding the details of convective and conductive heat flow processes and detailed monitoring of properties and processes in the subsurface.
On the TU Delft campus, we aim to drill a borehole of around 4.5 km depth to be used for the exploration, observation, and monitoring of subsurface processes that will be part of a larger research infrastructure under development. This so-called urban energy laboratory includes – in addition to the deep multi-use borehole – a well-instrumented geothermal doublet drilled in 2023, reaching to a depth of 2.2 km; a local seismic monitoring system (installed in 2022); an ultra-sensitive portable seismic monitoring array; and a high-temperature aquifer heat storage system (HT-ATES), for which a pilot well was drilled in 2024. With this urban energy laboratory, we want to tackle problems and better understand processes related to multiple and/or competing subsurface uses in urban environments. The deep exploration and monitoring borehole is designed specifically to monitor fluid and/or flux movement in 3D with unprecedented precision, aiming to understand the propagation of the geothermal cold front and reservoir pressures.
During the 3 d International Continental Scientific Drilling Program (ICDP)-sponsored UrbEnLab workshop, 75 scientists from 17 countries met in Delft, the Netherlands, in June 2024 to prioritize the scientific ambitions of the deep exploration and monitoring borehole and to discuss potential techniques that could be applied to tackle them. Assessing the life cycle of a geothermal system situated in a complex heterogeneous sedimentary system was defined as the broad aim, with revealing the detailed flow field established being a key priority.
On the TU Delft campus, we aim to drill a borehole of around 4.5 km depth to be used for the exploration, observation, and monitoring of subsurface processes that will be part of a larger research infrastructure under development. This so-called urban energy laboratory includes – in addition to the deep multi-use borehole – a well-instrumented geothermal doublet drilled in 2023, reaching to a depth of 2.2 km; a local seismic monitoring system (installed in 2022); an ultra-sensitive portable seismic monitoring array; and a high-temperature aquifer heat storage system (HT-ATES), for which a pilot well was drilled in 2024. With this urban energy laboratory, we want to tackle problems and better understand processes related to multiple and/or competing subsurface uses in urban environments. The deep exploration and monitoring borehole is designed specifically to monitor fluid and/or flux movement in 3D with unprecedented precision, aiming to understand the propagation of the geothermal cold front and reservoir pressures.
During the 3 d International Continental Scientific Drilling Program (ICDP)-sponsored UrbEnLab workshop, 75 scientists from 17 countries met in Delft, the Netherlands, in June 2024 to prioritize the scientific ambitions of the deep exploration and monitoring borehole and to discuss potential techniques that could be applied to tackle them. Assessing the life cycle of a geothermal system situated in a complex heterogeneous sedimentary system was defined as the broad aim, with revealing the detailed flow field established being a key priority.
A Research And Energy Production Geothermal Project On The TU Delft Campus
Project Implementation And Initial Data Collection
Conference paper
(2024)
-
Philip J. Vardon, Hemmo A. Abels, Liliana Vargas Meleza, Andrea Vondrak, Denis Voskov, Auke Barnhoorn, Alexandros Daniilidis, David Bruhn, Guy Drijkoningen, Kaylee Elliott, Beer van Esser, Susanne Laumann, Piet van Paassen
A geothermal well doublet, designed with two primary aims; one of research and the second of commercial thermal energy supply, is currently being installed on the campus of Delft University of Technology, with the wells being drilled in the second half of 2023. The project includes a comprehensive research program, involving the installation of a wide range of instruments alongside an extensive logging and coring program and monitoring network. The doublet has been cored, with continuous samples from the heterogenous reservoir being complimented with more distributed side-wall cores, alongside a large suite of open-hole well logs in the reservoir section of both wells. Such investigation is rarely undertaken in geothermal projects. A fiber optic cable will monitor the production well, and will be installed all-the-way down to the reservoir section when the well completion is installed, at approximately 2300m depth. The reservoir is the fluvial Lower Cretaceous Delft Sandstone that is used as a geothermal reservoir in a series of existing and planned doublets in the West Netherlands Basin. A local seismic monitoring network has been installed in the surrounding area with the aim of monitoring very low-magnitude natural or induced seismicity. A vertical observation well with electromagnetic sensors will be drilled in a few y ears’ time between the injector and producer to monitor cold-front propagation. The total project is targeted to supply around 25 MW of thermal energy at peak conditions, next to this project a thermal energy storage system is planned to provide a seasonal buffer. The project is a key national research infrastructure and is being incorporated into the European infrastructure EPOS (European Plate Observing System, https://www.epos-eu.org/), such that accessibility and data availability will be as wide as possible. All observations will be included in a digital-twin framework that will allow better decisions to be made in future geothermal projects. This paper presents the implementation and initial data collection from the project, including an initial evaluation of the logging and coring campaigns.
...
A geothermal well doublet, designed with two primary aims; one of research and the second of commercial thermal energy supply, is currently being installed on the campus of Delft University of Technology, with the wells being drilled in the second half of 2023. The project includes a comprehensive research program, involving the installation of a wide range of instruments alongside an extensive logging and coring program and monitoring network. The doublet has been cored, with continuous samples from the heterogenous reservoir being complimented with more distributed side-wall cores, alongside a large suite of open-hole well logs in the reservoir section of both wells. Such investigation is rarely undertaken in geothermal projects. A fiber optic cable will monitor the production well, and will be installed all-the-way down to the reservoir section when the well completion is installed, at approximately 2300m depth. The reservoir is the fluvial Lower Cretaceous Delft Sandstone that is used as a geothermal reservoir in a series of existing and planned doublets in the West Netherlands Basin. A local seismic monitoring network has been installed in the surrounding area with the aim of monitoring very low-magnitude natural or induced seismicity. A vertical observation well with electromagnetic sensors will be drilled in a few y ears’ time between the injector and producer to monitor cold-front propagation. The total project is targeted to supply around 25 MW of thermal energy at peak conditions, next to this project a thermal energy storage system is planned to provide a seasonal buffer. The project is a key national research infrastructure and is being incorporated into the European infrastructure EPOS (European Plate Observing System, https://www.epos-eu.org/), such that accessibility and data availability will be as wide as possible. All observations will be included in a digital-twin framework that will allow better decisions to be made in future geothermal projects. This paper presents the implementation and initial data collection from the project, including an initial evaluation of the logging and coring campaigns.
A newly installed research infrastructure for geothermal energy in a subsurface sedimentary reservoir for direct-use heating
The TU Delft campus geothermal project
A geothermal doublet has been installed in a sedimentary reservoir for direct-use heating on the TU Delft campus, targeted to supply around 25 MW of thermal energy at peak conditions. This contribution presents the implementation and initial data collection from the doublet, including an initial evaluation of the logging and coring campaign. Nearly half of Netherlands natural gas consumption is allocated to heating, and the on-campus CO2 emissions from heating exceed 50%. The doublet has been designed with two primary aims of research and commercial heat supply, with the wells being completed in December 2023. The project will be operated by a commercial entity, and built into a larger thermal energy system including a high temperature underground storage system, with the first energy production planned in 2025. The research questions relate to field-scale geothermal operations, e.g. how reliable is the long-term energy production?, how do materials perform in the long-term? and how can geothermal projects be best monitored? The research programme involves the installation of a wide range of instruments alongside an extensive logging and coring program and monitoring network. The doublet has been cored, with substantial continuous samples from the heterogenous reservoir, alongside a large suite of open hole well logs in the reservoir and through casing logs in overlying geological units. A fiber-optic cable will monitor distributed pressure throughout the producer reservoir section, at approximately 2300m depth, which will be installed during commissioning. A local seismic monitoring network has been installed in the surrounding area with the aim of monitoring very low-magnitude natural or induced seismicity. The project is a key national research infrastructure and is being incorporated into the European EPOS (European Plate Observing System, https://www.epos-eu.org/), such that accessibility and data availability will be as wide as possible. All observations will be included in a digital-twin framework that will allow to make better decisions in future geothermal projects.
...
A geothermal doublet has been installed in a sedimentary reservoir for direct-use heating on the TU Delft campus, targeted to supply around 25 MW of thermal energy at peak conditions. This contribution presents the implementation and initial data collection from the doublet, including an initial evaluation of the logging and coring campaign. Nearly half of Netherlands natural gas consumption is allocated to heating, and the on-campus CO2 emissions from heating exceed 50%. The doublet has been designed with two primary aims of research and commercial heat supply, with the wells being completed in December 2023. The project will be operated by a commercial entity, and built into a larger thermal energy system including a high temperature underground storage system, with the first energy production planned in 2025. The research questions relate to field-scale geothermal operations, e.g. how reliable is the long-term energy production?, how do materials perform in the long-term? and how can geothermal projects be best monitored? The research programme involves the installation of a wide range of instruments alongside an extensive logging and coring program and monitoring network. The doublet has been cored, with substantial continuous samples from the heterogenous reservoir, alongside a large suite of open hole well logs in the reservoir and through casing logs in overlying geological units. A fiber-optic cable will monitor distributed pressure throughout the producer reservoir section, at approximately 2300m depth, which will be installed during commissioning. A local seismic monitoring network has been installed in the surrounding area with the aim of monitoring very low-magnitude natural or induced seismicity. The project is a key national research infrastructure and is being incorporated into the European EPOS (European Plate Observing System, https://www.epos-eu.org/), such that accessibility and data availability will be as wide as possible. All observations will be included in a digital-twin framework that will allow to make better decisions in future geothermal projects.
A research and production geothermal project on the TU Delft campus
Initial modeling and establishment of a digital twin
Conference paper
(2024)
-
Denis Voskov, Hemmo Abels, Philip J. Vardon, Liliana Vargas Meleza, Eric Verschuur, Andrea Vondrak, Auke Barnhoorn, Yuan Chen, Alexandros Daniilidis, David Bruhn, Guy Drijkoningen, Sebastian Geiger, Susanne Laumann, Guofeng Song
Nearly half of the Netherlands’ natural gas consump tion is allocated to heating, with direct -use geothermal heating being one of the available low-carbon energy solutions. A geothermal well doublet, designed with the two primary aims of research and commercial heat supply, is currently being installed on the campus of Delft University of Technology. The project is a key national research infrastructure and is being incorporated into the European sustainable and distributed infrastructure (EPOS: European Plate Observing System, https://www.epos-eu.org/), such that accessibility and data availability will be as wide as possible. All observations will be included in a digital-twin framework, which will allow us to make better decisions in future geothermal projects. The project includes a comprehens ive research program, involving the installation of a wide range of instruments alongside an extensive logging and coring program and monitoring network. The doublet has been cored, with substantial continuous samples from the heterogeneous reservoir, alongside a large suite of well logs in both the reservoir and overlying geological units. Such investigation is rarely undertaken in geothermal projects. A fiber-optic cable will monitor the producer well all the way down to the reservoir section, at approximately 2300m depth, in the Lower Cretaceous Delft Sandstone that is used as a geothermal reservoir in a series of existing and planned doublets in the West Netherlands Basin. A local seismic monitoring network has been installed in the surrounding area with the aim of monitoring very low-magnitude natural or induced seismicity. A vertical observation well with electromagnetic sensors will be drilled in the near future between the injector and producer to monitor cold-front propagation. This paper presents the initial modeling for the project and steps towards the production of a digital twin. Two modeling examples in the paper will emp hasize current operational challenges relevant to the project.
...
Nearly half of the Netherlands’ natural gas consump tion is allocated to heating, with direct -use geothermal heating being one of the available low-carbon energy solutions. A geothermal well doublet, designed with the two primary aims of research and commercial heat supply, is currently being installed on the campus of Delft University of Technology. The project is a key national research infrastructure and is being incorporated into the European sustainable and distributed infrastructure (EPOS: European Plate Observing System, https://www.epos-eu.org/), such that accessibility and data availability will be as wide as possible. All observations will be included in a digital-twin framework, which will allow us to make better decisions in future geothermal projects. The project includes a comprehens ive research program, involving the installation of a wide range of instruments alongside an extensive logging and coring program and monitoring network. The doublet has been cored, with substantial continuous samples from the heterogeneous reservoir, alongside a large suite of well logs in both the reservoir and overlying geological units. Such investigation is rarely undertaken in geothermal projects. A fiber-optic cable will monitor the producer well all the way down to the reservoir section, at approximately 2300m depth, in the Lower Cretaceous Delft Sandstone that is used as a geothermal reservoir in a series of existing and planned doublets in the West Netherlands Basin. A local seismic monitoring network has been installed in the surrounding area with the aim of monitoring very low-magnitude natural or induced seismicity. A vertical observation well with electromagnetic sensors will be drilled in the near future between the injector and producer to monitor cold-front propagation. This paper presents the initial modeling for the project and steps towards the production of a digital twin. Two modeling examples in the paper will emp hasize current operational challenges relevant to the project.
End-of-Well Science Programme Report DEL-GT-01 and DEL-GT-02
TU Delft campus geothermal project
The TU Delft campus geothermal project has joint objectives of research and commercial thermal energy production. It has been developed and will be operated by the Geothermie Delft (GTD) consortium, a commercial cooperation between TU Delft, Aardyn, EBN and Shell Geothermal. This report gives an overview of the research activities that have been carried out during the implementation of the doublet drilling the wells DEL-GT-01 and DEL-GT-02, and the sidetracks DEL-GT-02-S1 and DEL-GT-02-S2 in the period June - December 2023. The research programme and related operations during the installation of the campus geothermal wells have been led by the scientific team of TU Delft department of Geoscience and Engineering. The project is part of the national research infrastructure for solid Earth science (https://epos-nl.nl/), and offers the possibility to do state of the art research on an operating geothermal system.
The main research activities that were carried out during the implementation of the geothermal wells included rock sampling in the form of a detailed drill cutting sampling set, full cores and sidewall cores of the caprock and the geothermal reservoir, open-hole logging of the reservoir formations and the installation of a fibre optic cable in the producer (still to be carried out).
Overall, the following samples and data were collected as part of the scientific programme:
- 15m of 4”core from the direct caprock of the producer reservoir section
- 71m of 4”core from the reservoir section of the producer
- 78 sidewall cores from the injector reservoir section
- 2400 cutting samples
- 3000m of open-hole and closed-hole logging data
Details of these activities can be found in the report and the related appendices. All data presented in this report have been published via TU Delft institutional data repository and can be found online as part of the data collection associated with the research programme of the project: Geothermal Project on TU Delft Campus Collection at https://doi.org/10.4121/85b3725b-80fa-4b0b-9db2-475bfd8f0265. ...
The main research activities that were carried out during the implementation of the geothermal wells included rock sampling in the form of a detailed drill cutting sampling set, full cores and sidewall cores of the caprock and the geothermal reservoir, open-hole logging of the reservoir formations and the installation of a fibre optic cable in the producer (still to be carried out).
Overall, the following samples and data were collected as part of the scientific programme:
- 15m of 4”core from the direct caprock of the producer reservoir section
- 71m of 4”core from the reservoir section of the producer
- 78 sidewall cores from the injector reservoir section
- 2400 cutting samples
- 3000m of open-hole and closed-hole logging data
Details of these activities can be found in the report and the related appendices. All data presented in this report have been published via TU Delft institutional data repository and can be found online as part of the data collection associated with the research programme of the project: Geothermal Project on TU Delft Campus Collection at https://doi.org/10.4121/85b3725b-80fa-4b0b-9db2-475bfd8f0265. ...
The TU Delft campus geothermal project has joint objectives of research and commercial thermal energy production. It has been developed and will be operated by the Geothermie Delft (GTD) consortium, a commercial cooperation between TU Delft, Aardyn, EBN and Shell Geothermal. This report gives an overview of the research activities that have been carried out during the implementation of the doublet drilling the wells DEL-GT-01 and DEL-GT-02, and the sidetracks DEL-GT-02-S1 and DEL-GT-02-S2 in the period June - December 2023. The research programme and related operations during the installation of the campus geothermal wells have been led by the scientific team of TU Delft department of Geoscience and Engineering. The project is part of the national research infrastructure for solid Earth science (https://epos-nl.nl/), and offers the possibility to do state of the art research on an operating geothermal system.
The main research activities that were carried out during the implementation of the geothermal wells included rock sampling in the form of a detailed drill cutting sampling set, full cores and sidewall cores of the caprock and the geothermal reservoir, open-hole logging of the reservoir formations and the installation of a fibre optic cable in the producer (still to be carried out).
Overall, the following samples and data were collected as part of the scientific programme:
- 15m of 4”core from the direct caprock of the producer reservoir section
- 71m of 4”core from the reservoir section of the producer
- 78 sidewall cores from the injector reservoir section
- 2400 cutting samples
- 3000m of open-hole and closed-hole logging data
Details of these activities can be found in the report and the related appendices. All data presented in this report have been published via TU Delft institutional data repository and can be found online as part of the data collection associated with the research programme of the project: Geothermal Project on TU Delft Campus Collection at https://doi.org/10.4121/85b3725b-80fa-4b0b-9db2-475bfd8f0265.
The main research activities that were carried out during the implementation of the geothermal wells included rock sampling in the form of a detailed drill cutting sampling set, full cores and sidewall cores of the caprock and the geothermal reservoir, open-hole logging of the reservoir formations and the installation of a fibre optic cable in the producer (still to be carried out).
Overall, the following samples and data were collected as part of the scientific programme:
- 15m of 4”core from the direct caprock of the producer reservoir section
- 71m of 4”core from the reservoir section of the producer
- 78 sidewall cores from the injector reservoir section
- 2400 cutting samples
- 3000m of open-hole and closed-hole logging data
Details of these activities can be found in the report and the related appendices. All data presented in this report have been published via TU Delft institutional data repository and can be found online as part of the data collection associated with the research programme of the project: Geothermal Project on TU Delft Campus Collection at https://doi.org/10.4121/85b3725b-80fa-4b0b-9db2-475bfd8f0265.
Drilling report
Delftse Hout multipurpose research borehole - DAPGEO-02
The multi-purpose research borehole at the Delftse Hout is the third of four seismic monitoring locations of the seismic monitoring network for the geothermal research project on the TU Delft campus (Geothermal Delft GTD, also known as DAPwell, https://geothermiedelft.nl/). For the geothermal research project, two deep wells (“a doublet” consisting of an injector and a producer) for geothermal energy extraction will be installed on the TU Delft campus next to the combined heat and power plant (“warmtekrachtcentrale - WKC”). The system will produce geothermal heat to supply the campus of TU Delft and part of the city of Delft.
The herein presented borehole describes the installation of a multi-purpose research borehole (called DAPGEO-02), which was installed in the period February - May 2022. DAPGEO-02 is part of a seismic monitoring system for the shallow and deeper subsurface in the vicinity of the planned geothermal doublet. The locations of all four stations are given in Figure 1. The monitoring network and the related research gathers knowledge about the current status of the subsurface on the basis of periodic data measurements, and possible seasonal effects.
Within the seismic monitoring network, three seismic monitoring stations have already been installed, respectively DAPGEO-01 on the proposed location of the geothermal project near the Leeghwaterstraat in Delft, DAPGEO-03 on the Kerkpolderweg in Delft, and ZH03 in on the Ackersdijkseweg in Pijnacker-Nootdorp (installed and equipped by KNMI). ...
The herein presented borehole describes the installation of a multi-purpose research borehole (called DAPGEO-02), which was installed in the period February - May 2022. DAPGEO-02 is part of a seismic monitoring system for the shallow and deeper subsurface in the vicinity of the planned geothermal doublet. The locations of all four stations are given in Figure 1. The monitoring network and the related research gathers knowledge about the current status of the subsurface on the basis of periodic data measurements, and possible seasonal effects.
Within the seismic monitoring network, three seismic monitoring stations have already been installed, respectively DAPGEO-01 on the proposed location of the geothermal project near the Leeghwaterstraat in Delft, DAPGEO-03 on the Kerkpolderweg in Delft, and ZH03 in on the Ackersdijkseweg in Pijnacker-Nootdorp (installed and equipped by KNMI). ...
The multi-purpose research borehole at the Delftse Hout is the third of four seismic monitoring locations of the seismic monitoring network for the geothermal research project on the TU Delft campus (Geothermal Delft GTD, also known as DAPwell, https://geothermiedelft.nl/). For the geothermal research project, two deep wells (“a doublet” consisting of an injector and a producer) for geothermal energy extraction will be installed on the TU Delft campus next to the combined heat and power plant (“warmtekrachtcentrale - WKC”). The system will produce geothermal heat to supply the campus of TU Delft and part of the city of Delft.
The herein presented borehole describes the installation of a multi-purpose research borehole (called DAPGEO-02), which was installed in the period February - May 2022. DAPGEO-02 is part of a seismic monitoring system for the shallow and deeper subsurface in the vicinity of the planned geothermal doublet. The locations of all four stations are given in Figure 1. The monitoring network and the related research gathers knowledge about the current status of the subsurface on the basis of periodic data measurements, and possible seasonal effects.
Within the seismic monitoring network, three seismic monitoring stations have already been installed, respectively DAPGEO-01 on the proposed location of the geothermal project near the Leeghwaterstraat in Delft, DAPGEO-03 on the Kerkpolderweg in Delft, and ZH03 in on the Ackersdijkseweg in Pijnacker-Nootdorp (installed and equipped by KNMI).
The herein presented borehole describes the installation of a multi-purpose research borehole (called DAPGEO-02), which was installed in the period February - May 2022. DAPGEO-02 is part of a seismic monitoring system for the shallow and deeper subsurface in the vicinity of the planned geothermal doublet. The locations of all four stations are given in Figure 1. The monitoring network and the related research gathers knowledge about the current status of the subsurface on the basis of periodic data measurements, and possible seasonal effects.
Within the seismic monitoring network, three seismic monitoring stations have already been installed, respectively DAPGEO-01 on the proposed location of the geothermal project near the Leeghwaterstraat in Delft, DAPGEO-03 on the Kerkpolderweg in Delft, and ZH03 in on the Ackersdijkseweg in Pijnacker-Nootdorp (installed and equipped by KNMI).