Aircraft component repair shop scheduling with a stock driven priority
A KLM Avionics case study
H. Bijzitter (TU Delft - Mechanical Engineering)
I.I. de Pater – Mentor (TU Delft - Aerospace Engineering)
M.J. Ribeiro – Mentor (TU Delft - Aerospace Engineering)
F. Schulte – Graduation committee member (TU Delft - Mechanical Engineering)
Eef van Taanom-Korzilius – Mentor (KLM Engineering and Maintenance)
Remco Timmermans – Mentor (KLM Engineering and Maintenance)
Sander Lakerveld – Graduation committee member (KLM Engineering and Maintenance)
More Info
expand_more
Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.
Abstract
When an aircraft component is removed for maintenance or inspection, it is replaced from a shared stock and repaired in an MRO shop. If components return late, they can cause stockouts and therefore aircraft on ground situations; to prevent this, the airline needs a larger safety stock or has to borrow components from a third party at a high price. Which components return to stock first, and when, depends largely on the order in which the repair shop carries out its work. Earlier studies set the priority of repairs from the stock position, or schedule shops with qualified technicians, test benches or uncertain inflow, but none of the reviewed studies weighs the financial consequence of a stock shortage in a detailed schedule of a complete shop and evaluates it against the historical performance of that shop. In the proposed approach, each repair job receives a priority weight that balances its deadline against the risk that the stock of its component runs short. Jobs are then scheduled in batches, in order of their weight, on qualified technicians and test benches by a mixed-integer linear programme, and the plan is renewed several times a day within a rolling horizon. The approach is evaluated in a simulation that replays two months of operational data from an avionics repair shop of KLM Engineering & Maintenance, against the historical execution of the shop and against three benchmark methods: a greedy rule with the same priority, simulated annealing and a genetic algorithm. Compared with the historical execution, on-time delivery rises by 18 percentage points, the turnaround time falls by 34 per cent and the borrow cost exposure that a schedule can influence falls by 64 per cent. A large share of this gain comes from the new priority and from replanning several times a day; the optimisation of the schedule adds a further reduction in turnaround time and exposure. With the same technicians and test benches, a stock driven priority, an optimised schedule and frequent replanning are enough to return components to stock sooner and to reduce the cost of shortages.