Searched for: +
(21 - 22 of 22)

Pages

document
Coelho, B. (author), Priest, J. (author), Holscher, P. (author), Powrie, W. (author)
Transitions between railway track on embankments or natural ground and fixed structures such as bridges and culverts often require substantial additional maintenance to preserve line, level and ride quality. This extra maintenance not only increases costs but also causes delays. Despite its importance for railway infrastructure owners, the...
conference paper 2009
document
Bakker, K.J. (author), Bezuijen, A. (author)
Ten years have passed since in 1997 for the first time construction of bored tunnels in the Netherlands soft soil was undertaken. Before that date essentially only immersed tunnels and cut-and-cover tunnels were constructed in the Netherlands. The first two bored tunnels were Pilot Projects, the 2nd Heinenoord tunnel and the Botlek Rail tunnel....
conference paper 2008