Searched for: +
(1 - 19 of 19)
document
Shahverdi, Amir Farbod (author), Mostafavi, F. (author), Roodkoly, Sogand Haghighat (author), Zomorodian, Zahra Sadat (author), Homayouni, Hoda (author)
As the current environmental crisis and depletion of our energy resources are pushing the Architecture, Engineering, and Construction (AEC) industry toward the design and construction of High-Performance (HP) buildings, new organizational and technological methods of practice, such as Integrated Design Process (IDP) and Building Information...
journal article 2024
document
Parkin, S.E. (author), Kuhn, Kristen (author), Shaikh, Siraj A. (author)
The executive leadership in corporate organizations is increasingly challenged with managing cyber-risks, as an important part of wider business risk management. Cyber-risks are complex, with the threat landscape evolving, including digital infrastructure issues such as trust in networked supply chains, and emerging technologies. Moreover,...
journal article 2023
document
van der Meer, Jeroen (author), Hartmann, Andreas (author), van der Horst, A.Q.C. (author), Dewulf, Geert (author)
Awareness of design risks is essential for preparing integrated design and construction tenders as decisions in this phase can have serious consequences once the project is awarded. The practice of multi-criteria decision analysis (MCDA) promises to support contractors in dealing with risks in the decision-making process. However, due to...
journal article 2022
document
Zgonnikov, A. (author), Abbink, D.A. (author), Markkula, Gustav (author)
Objective: We aim to bridge the gap between naturalistic studies of driver behavior and modern cognitive and neuroscientific accounts of decision making by modeling the cognitive processes underlying left-turn gap acceptance by human drivers. Background: Understanding decisions of human drivers is essential for the development of safe and...
journal article 2022
document
Janssen, M.F.W.H.A. (author), Hartog, M.W. (author), Matheus, R. (author), Ding, Aaron Yi (author), Kuk, George (author)
Computational artificial intelligence (AI) algorithms are increasingly used to support decision making by governments. Yet algorithms often remain opaque to the decision makers and devoid of clear explanations for the decisions made. In this study, we used an experimental approach to compare decision making in three situations: humans making...
journal article 2020
document
Roungas, V. (author), Bekius, F.A. (author), Verbraeck, A. (author), Meijer, S.A. (author)
Gaming simulations (games) for policy and decision making have been the neglected “sibling” of educational and training games. The latter have experienced a widespread usage by practitioners and researchers, while the former have had limited, yet slowly increasing, adoption by organisations. As a result, various issues developing and using these...
journal article 2020
document
Valks, B. (author), Arkesteijn, M.H. (author), Koutamanis, A. (author), den Heijer, A.C. (author)
At universities worldwide, creating a ‘smart campus’ is gaining significance. This is a response to the increasingly dynamic use of the campus and the pressure on resources: energy, financial and human resources. The university community has become more mobile, student numbers more unpredictable and funding more uncertain. Consequently, campus...
journal article 2020
document
Shi, Qianqian (author), Hertogh, M.J.C.M. (author), Bosch-Rekveldt, M.G.C. (author), Zhu, Jianbo (author), Sheng, Zhaohan (author)
The goal of this study is to identify, classify, explore, and understand decision-making complexity elements in major infrastructure projects (MIPs). This article puts forward systematic definitions of decision making, decision-making quality, and decision-making complexity. Based on literature reviews and an in-depth case analysis of Hong...
journal article 2020
document
Jobst, B.S. (author), Thoring, K.C. (author), Badke-Schaub, P.G. (author)
Sketching and prototyping are parts of a 'reflective conversation with materials of a design situation' (Schön, 1992). To support this conversation, we developed a reflective tool -the Reflection Canvas- that facilitates reflection activities through sketching and prototyping on the one hand and verbalisation on the other. We introduced the...
journal article 2020
document
McPhail, C. (author), Maier, H. R. (author), Westra, S. (author), Kwakkel, J.H. (author), van der Linden, L. (author)
Multiple plausible future scenarios are being used increasingly in preference to a single deterministic or probabilistic prediction of the future in the long-term planning of water resources systems. These scenarios enable the determination of the robustness of a system—the consideration of performance across a range of plausible futures—and...
journal article 2020
document
Borst, C. (author), Somers, V.L.J. (author), Mulder, Max (author)
Air Traffic Control (ATC) workload is a limiting factor for air traffic growth, creating a need for objective ATC workload metrics. Previous research has shown that the solution space diagram can be a basis for a workload prediction metric. The current solution space metric however, does not incorporate altitude. In this paper, a 3D solution...
journal article 2019
document
Kooijman, L. (author), Happee, R. (author), de Winter, J.C.F. (author)
In future traffic, automated vehicles may be equipped with external human-machine interfaces (eHMIs) that can communicate with pedestrians. Previous research suggests that, during first encounters, pedestrians regard text-based eHMIs as clearer than light-based eHMIs. However, in much of the previous research, pedestrians were asked to imagine...
journal article 2019
document
Kranzbühler, A. (author), Kleijnen, Mirella (author), Verlegh, P.W.J. (author), Teerling, M. (author)
Background: Increasing numbers of patients consult Web-based rating platforms before making health care decisions. These platforms often provide ratings from other patients, reflecting their subjective experience. However, patients often lack the knowledge to be able to judge the objective quality of health services. To account for this...
journal article 2019
document
Kana, A.A. (author)
journal article 2017
document
Barros, E.G.D. (author), Van den Hof, P.M.J. (author), Jansen, J.D. (author)
This paper proposes a new methodology to perform value of information (VOI) analysis within a closed-loop reservoir management (CLRM) framework. The workflow combines tools such as robust optimization and history matching in an environment of uncertainty characterization. The approach is illustrated with two simple examples: an analytical...
journal article 2015
document
de Weerdt, M.M. (author), Stein, Sebastian (author), Gerding, Enrico (author), Robu, Valentin (author), Jennings, Nick (author)
This paper introduces a novel intention-aware routing system (IARS) for electric vehicles. This system enables vehicles to compute a routing policy that minimizes their expected journey time while considering the policies, or intentions, of other vehicles. Considering such intentions is critical for electric vehicles, which may need to recharge...
journal article 2015
document
Naeimi, M. (author), Alimoradi, Z. (author), Razi, M. (author), Monajjem, S. (author)
The present article involves in evaluation and engineering judgment of various geometric configurations for highway interchanges by considering substantial parameters over the discretion process. The geometric, economical and architectural criteria as the fundamental indicators are divided into related sub-indicators and the total combinations...
journal article 2014
document
Slinger, J.H. (author), Hilders, M. (author), Juizo, D. (author)
The Incomati River Basin is shared by Mozambique, South Africa, and Swaziland. In August 2002, the groundbreaking “Tripartite Interim Agreement on Water Sharing of the Maputo and Incomati Rivers” (the IncoMaputo agreement) was signed. Following reports that the use, availability, and adequacy of information posed problems for future decision...
journal article 2010
document
Konstantinou, T. (author), Knaack, U. (author)
Refurbishing the existing building stock is an acknowledged issue in the building industry. Even though awareness has been raised, the design phase of refurbishment projects is often problematic. The decisions taken in the early stages of the design determine the final result; however, the assessment of the environmental performance only happens...
journal article
Searched for: +
(1 - 19 of 19)