Searched for: +
(1 - 1 of 1)
document
Groen, Maarten (author)
It is expected by the EWEA that in the North Sea only the wind energy capacity will increase to 45 GW. In 2015 the capacity was only 5.2 GW. Offshore contractors should be capable of installing lots of turbines and just that is a problem. As turbines increase in size installation vessels need significant upgrades. Therefore, most contractors...
master thesis 2019