Searched for: +
(1 - 3 of 3)
document
Blom, H.A.P. (author), Jiang, C. (author), Grimme, W.B.A. (author), Mitici, M.A. (author), Cheung, Yuk S. (author)
Commercial aviation distinguishes three indicators for third party risk (TPR): i) Expected number of ground fatalities per aircraft flight hour; ii) Individual risk; and iii) Societal risk. The latter two indicators stem from TPR posed to population by operation of hazardous installations. Literature on TPR of Unmanned Aircraft System (UAS)...
journal article 2021
document
Jiang, N. (author), Erdös, M. (author), Moultos, O. (author), Shang, R. (author), Vlugt, T.J.H. (author), Heijman, Sebastiaan (author), Rietveld, L.C. (author)
The adsorption of organic micropollutants (OMPs) on high-silica zeolites is characterized by adsorption isotherms with various shapes. The occurrence of an S-shaped adsorption isotherm indicates the lack of adsorption affinity for OMPs at low, environmentally relevant equilibrium concentrations. In this study, S-shaped isotherms were observed...
journal article 2020
document
Liu, Huimin (author), Jiang, Canhui (author), Liu, Y. (author), Hertogh, M.J.C.M. (author), Lyu, Xue (author)
The high uncertainty of megaproject results in increasing complexity in the decisionmaking and ultimately leads to different degrees of cost overrun and project delays. One of the critical reasons for cost overrun and delay is the optimism bias of decision makers. Although the previous literature has analyzed the cost overrun distribution of...
journal article 2018